Located in the busy street of Taipei city, it was an old office building. After reconstruction, the building includes three sections including business section, office section and hotel section. Because of fires, the machinery spaces in B1F & B4F will shut down all utility power and air conditioner system. Hence the owner installed the water mist system, it is because the effectiveness of using few water for firefighting and will be soon back to normal operation as well.